SOCIADEDAD PARTNERS CONSULTORES LTDA.
RUT 76546340-8
Distribución anual
| Año | Recibido | Emitido | Volumen |
|---|---|---|---|
| 2024 | $479.1 M(13) | — | |
| 2023 | $472.4 M(12) | — | |
| 2022 | $447.6 M(11) | — | |
| 2021 | $425.9 M(11) | — | |
| 2020 | $383.1 M(10) | — | |
| 2019 | $405.5 M(12) | — | |
| 2018 | $356.8 M(12) | — | |
| 2017 | $335.0 M(5) | — | |
| 2016 | $391.8 M(11) | — | |
| 2015 | $331.3 M(5) | — | |
| 2014 | $115.6 M(2) | — | |
| 2013 | $382.7 M(22) | — | |
| 2012 | $282.7 M(8) | — | |
| 2011 | $317.4 M(14) | — | |
| 2010 | $92.9 M(10) | — | |
| 2009 | $174.3 M(13) | — | |
| 2008 | $41.3 M(2) | — | |
Transferencias recibidas
173 registros · $5.435.375.088
- FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROYECTO 08.459005.00240.24
$44.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROYECTO 08.457201.00148.24
$70.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROYECTO 08.457201.00147.24
$70.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS PROY.08.459104.00233.24
$35.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS PROY 08.541504.00072.24
$57.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS PROY 08.541504.00076.24
$60.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS PROY 08.541504.00074.24
$57.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.459104.00233.24
$3.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.457201.00147.24
$17.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.457201.00148.24
$17.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.541504.00074.24
$14.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.541504.00076.24
$15.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.541504.000721.24
$14.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS AL PROY 08.458101.00177.23
$79.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROY 08.541104.00101.23
$90.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROY 08.541104.00102.23
$62.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROY 08.541104.00103.23
$62.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROY 08.541104.00105.23
$62.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA PROY 08.541104.00104.23
$66.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA PROY. 08.458101.00177.23
$8.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.541104.00102.23
$7.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.541104.00105.23
$7.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.541104.00104.23
$7.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.541104.00101.23
$10.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.541104.00103.23
$7.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.488101.00247.22
$83.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 2 YO EMPRENDO SEMILLA SSYO CODIGO 08.591102.00076.22
$58.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 2 YO EMPRENDO SEMILLA BIO BIO CODIGO 08.591102.00075.22
$78.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 1 YO EMPRENDO BASICO BIO BIO CODIGO 08.488101.00247.22
$4.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 2 YO EMPRENDO SEMILLA SSYO CODIGO 08.591102.00076.22
$58.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 1 YO EMPRENDO BASICO BIO BIO CODIGO 08.488101.00247.22
$4.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 2 PROGRAMA YES BIO BIO 7 CODIGO 08.591102.00075.22
$78.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA APORTE FOSIS AL PROY 08.591102.00073.22
$58.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 1 YO EMPRENDO SEMILLA BIO BIO 7 CODIGO 08.591102.00075.22
$8.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 1 YO EMPRENDO SEMILLA BIO BIO 2 CODIGO 08.591102.00076.22
$6.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO CUOTA 1 YO EMPRENDO SEMILLA BIO BIO 4 CODIGO 08.591102.00073.22
$6.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA APORTE FOSIS AL PROY 08.488101.00260.21
$87.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08-591103-00138-21
$56.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08-591103-00137-21
$58.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08-591103-00137-21
$58.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08-591103-00134-21
$74.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08-591103-00131-21
$56.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROY 08.488101.00260.21
$6.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROY 08.591103.00134.21.
$8.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROY 08.591103.00137.21.
$6.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROY 08.591103.00138.21.
$6.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROY 08.591103.00131.21.
$6.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS AL PROY 08.489001.00193.20
$91.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS AL PROY 08.591101.00091.20
$55.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS AL PROY 08.591101.00096.20
$79.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS AL PROY 08.591101.00095.20
$55.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1 CUOTA APORTE FOSIS AL PROY 08.489001.00193.20
$10.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2 CUOTA APORTE FOSIS AL PROY 08.591101.00089.20
$62.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.591101.00091.20
$6.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.591101.00096.20
$8.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.591101.00095.20
$6.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.591101.0009.20
$6.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08.488108.00338-19
$47.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CODIGO 08.591106.00285-19
$61.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TRANSFERENCIA SEGUNDA CUOTA PROYECTO CODIGO 08-488101-00120-19
$81.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CÓDIGO 08.591101.00092-19
$51.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO PRIMERA CUOTA PROYECTO CÓDIGO 08.488108.00338-19
$2.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDA CUOTA PROYECTO CÓDIGO 08.488302.00141-19
$56.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO SEGUNDO CUOTA PROYECTO COD. 08.591101.00095-19
$59.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PAGO PRIMERA CUOTA PROYECTO N° 08.591106.00285-19
$3.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.488302.00141.19
$6.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.488101.00120.19
$9.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.591101.00095.19
$14.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA APORTE FOSIS AL PROYECTO 08.591101.00092.19
$12.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2 DE 2 PROYECTO 08.591108.00474-18
$46.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2 DE 2 PROYECTO 08.591107.00461-18
$50.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2 DE 2 PROYECTO 08.591107.00462-18
$57.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2 DE 2 PROYECTO 08.591108.00475-18
$58.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2 DE 2 PROYECTO 08.591105.00268-18
$57.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2 DE 2 PROYECTO 08.591106.00327-18
$49.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 01/02, PROYECTO CODIGO 08.591108.00474-18
$2.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 01/02, PROYECTO CODIGO 08.591107.00461-18
$2.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 01/02, PROYECTO CODIGO 08.591104.00182-18
$3.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 2 PROYECTO 08.591108.00475-18
$3.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1/2 PROYECTO 08.591106.00327-18
$12.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 2 PROYECTO 08.591105.00268-18
$14.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 1 PROYECTO 08.488102.00313-17
$61.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 1 PROYECTO 08.488102.00314-17
$35.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 1 PROYECTO 08.591103.00468-17
$56.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 1 PROYECTO 08.591103.00417-17
$105.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 DE 1 PROYECTO 08.591103.00469-17
$77.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2/2, PROYECTO 08.591101.00023-16
$34.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2/2, PROYECTO 08.591101.00022-16
$47.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2/2, PROYECTO 08.591101.00089-16
$29.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2/2 PROYECTO 05.591101.00021-16
$64.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2/2, PROYECTO 08.591101.00024-16
$64.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 2/2, PROYECTO 08.591101.00024-16
$54.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00021.16.
$27.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00022.16.
$20.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00023.16. PAGADO MEDIANTE TRANSFERENCIA ELECTRÓNICA EL 03 DE JUNIO DEL 2016 EN CUENTA CORRIENTE 62414081 DEL BANCO SANTANDER
$14.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00024.16.
$23.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00089.16.
$12.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 PROYECTO 08.591103.00425-15
$51.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 PROYECTO 08.591103.00429-15
$85.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 PROYECTO 08.591103.00427-15
$88.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 PROYECTO 08.591103.00424-15
$66.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
CUOTA 1 PROYECTO 08.591103.00426-15
$39.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00086-14
$68.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00088-14
$47.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TERCERA CUOTA PROYECTO 08.591101.00142-13
$14.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TERCERA CUOTA PROYECTO 08.591101.00140-13
$16.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591102.00504-13
$29.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TERCERA CUOTA PROYECTO 08.591101.00143-13
$13.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TERCERA CUOTA PROYECTO 08.591101.00139-13
$17.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TERCERA CUOTA PROYECTO 08.591101.00141-13
$20.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.781101.00221-13
$22.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.781101.00220-13
$22.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.591101.00142-13
$29.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.591101.00140-13
$33.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.488302.00233-13
$4.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.591101.00141-13
$40.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.591101.00139-13
$34.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.591101.00143-13
$26.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00142-13
$4.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00140-13
$5.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.781101.00220-13
$7.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.781101.00221-13
$7.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00143-13
$4.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00141-13
$6.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591101.00139-13
$5.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.488302.00233-13
$14.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO 08.891101.00127-12
$26.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.771103.00539-12
$54.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.881104.00522-12
$22.9 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591102.00479-12
$35.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591102.00477-12
$40.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591102.00478-12
$60.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.591102.00474-12
$32.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA PROYECTO 08.891101.00127-12
$11.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA DEL PROYECTO 08.420102.00386-11
$50.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA DEL PROYECTO CODIGO 08.700601.00111-11
$20.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA DEL PROYECTO CODIGO 08.050501.00154-11
$6.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA DEL PROYECTO CODIGO 08.520004.00276-11
$44.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA DEL PROYECTO CODIGO 08.5200001.00194-11
$44.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA DEL PROYECTO CODIGO 08.520001.00192-11
$36.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
SEGUNDA CUOTA PROYECTO CODIGO 08.520001.00193-11
$44.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DE PROYECTO CODIGO 08.420102.00386-11
$12.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DE PROYECTO CODIGO 08.050501.00154-11
$4.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DEL PROYECTO CODIGO 08.520004.00276-11
$11.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DE PROYECTO CODIGO 08.520001.00193-11
$11.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DE PROYECTO CODIGO 08.700601.00111-11
$13.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DE PROYECTO CODIGO 08.520001.00194-11
$11.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
3º CUOTA DE PROYECTO Nº.08,510001,00522-10
$4.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº. 08,520005,00564-10
$12.4 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº. 08,520006,00592-10
$22.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA PROYECTO Nº. 08,050504,00718-10
$27.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,520006,00592-10
$2.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº.08,510001,00522-10
$8.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,510001,00522-10
$662.500 - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº.08,520005,00564-10
$3.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
PRIMERA CUOTA DE PROYECTO CODIGO 08.520001.00192-11
$9.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
3º CUOTA DE PROYECTO Nº. 08,520006,00518-09
$3.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2° CUOTA DE PROYECTO N°. 08,520006,00518-09
$9.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,520006,00518-09
$3.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
TERCERA CUOTA APORTE FOSIS AL PROY 08.050501.00152.09
$5.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
3º CUOTA DE PROYECTO Nº. 08,510001,00135-09
$10.7 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
3º CUOTA DE PROYECTO Nº. 08,520001,00119-09
$13.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
3º CUOTA DE PROYECTO Nº. 08,520001,00120-09
$18.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº. 08,050501,00152-09
$17.6 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº. 08,510001,00135-09
$17.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº. 08,520001,00119-09
$23.0 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
2º CUOTA DE PROYECTO Nº. 08,520001,00120-09
$30.3 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,050501,00512-09
$5.8 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,510001,00135-09
$7.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,520001,000120-09
$12.1 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº.08,520001,00119-09
$9.2 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
APORTE FOSIS AL PROYECTO 08.520007.00507.08
$22.5 M - FONDO DE SOLIDARIDAD E INVERSION SOCIAL
1º CUOTA DE PROYECTO Nº. 08,520005,00386-08
$18.8 M